HyperLink 

Technology Training Center
Ohio State University

Columbus, Ohio, USA

 

Technology Training Center

Delta Partner: Building Control Integrators

Project size: 48,528 sq. ft.

Facility / System Description:

  • Cooling tower, with associated pumps

  • Make-up air unit

  • 4 Boilers

  • Heat-pump loop

  • BACnet/IP over WAN / internet

 

DDC Architecture:

Item

Quantity

Connection Points

Operator Workstation

1

N/A

System Controllers

1

55

Application Controllers

1

5