Upper River Valley Hospital

Waterville, NB, Canada

 

Upper River Valley Hospital

Delta Partner: Controls & Equipment

Building Owner: River Valley Health

Project Type: New Construction / Hospital

LEED Level: Silver

Start Date: June 2006

End Date: November 2007

No of Buildings: 4

No of Floors: 3

Total Square Feet: 184,000

Facility / System Description:

 

The Upper River Valley Hospital is a 70 bed health care facility located in Waterville New Brunswick Canada. The Hospital was built using LEED strategies, with the objective of obtaining LEED Silver status.

 

The facility has its own well water field to supply both potable and non potable water reservoirs. The rain water and water used in the reverse osmosis water purifying systems is captured and used in the non potable reservoirs. The non potable reservoirs can be filled by the well field and via the recovery system. The BMS system by user defined levels in the non potable reservoir can allow the levels to drop if there is an expected rain fall thus alleviating the use of the well field when rain fall is expected.

 

The facility also has its own waste water treatment plant. The main building is oriented to take advantage of natural lighting. Patient rooms have large windows allowing the natural light into the space. The main mechanical systems utilize tried and true control strategies which keep energy consumptions to a minimum.

 

The project was a fast track and rumored to be one of the fastest in Canada. This proposed difficulties in our staffing needs but with the Delta product simplicity and reliability this helped with the severe time crunch as we neared completion.

 

Integration was also key to this project, we integrated with ABB(25+VFD’s),Trane(3 Chillers),Cleaver Brooks(6 Boilers),MGI(11 VFD’s this was their first BACNET integration). The BMS also controls the smoke control sequence; feedback from the fire alarm system initiates 20+ strategies.A commissioning agent was utilized in the commissioning of the facility to ensure that the mechanical systems are operating in the most energy efficient manner.

 

The “Do It Right” philosophy in both the Delta product and our skilled staff has made this project a success for us and the owner of this facility. We are proud to have been a part of URVH and are anxiously awaiting confirmation of the LEED Silver status.

 

DDC Architecture:

Product

Model

Quantity

Connected I/O Points

System Architecture

 

 709 Control Devices

 7716 pts (including all Integrated Points)

OWS / Integrated OWS

 

 3

 

Webserver / ORCAweb

 

 1

 

Area Controllers

 DSM

 12

 

System Controllers

 DSC

 46

 789 Points

Application Controllers

 DAC

 610

 4309 Points

Field Modules

 DFM

 

 

Access Controller

 ASM

 

 

Access Door Controllers

 ADM

 

 

Card Readers

 

 

 

Card Users

 

 

 

Lighting Controllers

 DLC

 

 

ORCA Power

 

 

 

ORCA Main

 

 

 

 

3rd Party BACnet Integration

Type

Manufacturer

Application

Native BACnet, Gateway

 Trane

Boiler, Chiller, VFD