ABN-AMRO Bank
Moscow, Russia
Delta Partner: ISS-Project
Start Date: May 2007
End Date: August 2007
No of Buildings: 1
No of Floors: 1
Project size: 7,000 sq. ft.
Facility / System Description:
-
New business centre.
-
1 floor for bank back-office and data center.
-
Delta’s system monitors leakage, temperature, humidity in ABN-AMRO bank’s data center.
-
Controls of glycol temperature for precision air conditioning units using dry coolers.
-
SMS alarming to maintenance staff.
-
MODBUS integration of Caterpillar diesel, Schneider Electric PM800 power meters, Liebert UPSes.
DDC Architecture:
|
Product
|
Model
|
Quantity
|
Connected I/O Points
|
|
System Architecture
|
|
|
|
|
OWS / Integrated OWS
|
DOW
|
1
|
|
|
Webserver / ORCAweb
|
|
|
|
|
Area Controllers
|
DSM
|
1
|
|
|
System Controllers
|
DSC
|
|
|
|
Application Controllers
|
DAC
|
3
|
40
|
|
Field Modules
|
DFM
|
6
|
88
|
|
Access Controller
|
ASM
|
|
|
|
Access Door Controllers
|
ADM
|
|
|
|
Card Readers
|
|
|
|
|
Card Users
|
|
|
|
|
Lighting Controllers
|
DLC
|
|
|
|
ORCA Power
|
|
|
|
|
ORCA Main
|
|
|
|
3rd Party BACnet Integration
|
Type
|
Manufacturer
|
Application
|
|
MODBUS
|
Caterpillar Diesel, Liebert
|
AHU; Chiller; Monitoring of Main Power, UPS’s, Diesel, Water Leakage, Fire Alarm
|