HyperLink 

Leatherhead Business Park—Phase 1

Surrey, England

 

Leatherhead Business Park

Delta Parnter: Acorn Integrated Systems

Project size: 40,000 sq. ft.

Facility / System Description:

  • New construction phase 1 with future phases 2 & 3

  • Chilled water system

  • Multiple boilers

  • Large air handling unit

  • 120 Fan coil units with CHW and LTHW

 

DDC Architecture:

Item

Quantity

Connection Points

Operator Workstation

1

N/A

System Controllers

2

90

Application Controllers

120

840